Riva, a sustainable company

04/02/2020-The company applied to the GIRO Seal, a program launched by the Ministry of Environment and Public Space, which aims to reduce, reuse and recycle waste in the offices of the City of Buenos Aires, which he qualified from the analysis of good practices and conditions linked to the internal management of the waste generated.

Gender Violence Workshop at work

12/12/2019-Within the framework of National Law 26485, which has as main objective to prevent, punish and eradicate gender-based violence, in the Sáenz Transshipment Center, this problem was addressed together with the National Institute of Women and the Ministry of Transportation. A workshop on gender violence and complaints handling was held, which was attended by all work personnel.

Advances in the High Complexity Hospital of Santa Rosa (La Pampa)

21/11/2019-The following masonry tasks are currently underway: gutter cord over existing roadway, pump room, foundation and exterior fencing masonry, among others. Thermomechanical installation work is also being carried out: in the internment sectors, tasks of assembly and laying of hot and cold water pipes for the fan coil heating equipment of the rooms, and the assembly of ducts for heating of public spaces . In addition, the laying of medical gas pipes, which are oxygen, vacuum and compressed air pipes.

Started the work of INVAP in Agronomy – CABA

11/10/2019-The work includes the execution of the reinforced concrete structure and annexed works of the Conventional Sector – Stage N ° 1 of the Argentine Center for Proton Therapy (CEARP), where in the future radiotherapy techniques, the new proton radiation therapy will be carried out to fight cancer with advanced treatments. CEARP will be the first in the country and in Latin America. It will consist of two buildings. They, once finished, will look and functionally operate as a unique building for users.

Inauguration of the new headquarters of the General Archive of the Nation

The work team of AGN is finalizing details for the finalization and provisional delivery of the work. The volume on Rondeau Street has two floors, where the public and administrative sector is located: the first has a multipurpose room, training rooms, confectionery and public attention areas; in the second one located on the first floor, there are the offices destined for the management, administration and cataloging of documents. The tower on Pichincha Street consists of subsoil, ground floor and six floors, contains the spaces dedicated to deposits of the AGN documentary collection, the sectors of reception, cataloging and restoration of documents, personnel access and machine rooms. Currently the installation of installations is underway: electrical, thermomechanical, fire detection, sanitary, irrigation, CCTV (Closed Circuit Television) and access control. The last tasks to be carried out involve the installation of final equipment: curtains and curtains, audio, furniture, signage, alarm, landscaping and the final cleaning of the entire building.

Students of the FADU visited the work Torre de Control

Students of Architecture of the FADU (UBA) visited the work Tower of Control that the UTE Riva-Niro is constructing in the International Airport of Ezeiza, Buenos Aires. The students and professors of the Practical and Organization of Work subject, of the Angelomé chair, toured both the ACC Basamento Building and the TWR Control Tower Building, guided by the Gte. of work, the Architect Daniel Androetto. Within the framework of its program of observations of work, in which analyzed from the perspective of construction company professional roles, price formation, programming and planning, production infrastructure, production resources and environment.

Work progresses in the work “Astor San Telmo”

It is a multi-family building that is being carried out in 3 stages simultaneously. Excavation and sub-curing works are currently being carried out; which would complete the subfloors in their entirety. They also completed the tasks of concreting the slabs on the second and third floors, and they are carrying out tasks of electrical, sanitary and masonry installations.